Residential concrete pool

Pool construction in Málaga and the Costa del Sol

A built-in pool combines structural work, waterproofing and a dedicated hydraulic installation. We coordinate every stage with the trades involved and the processing of the required project.

What it involves

Much more than a container of water

Building a pool means a stamped technical project and a works licence in every municipality in the province. The plot, the setbacks to boundaries, access for excavation machinery and the location of the plant room shape project viability from day one.

The work runs in phases: setting out, excavation, reinforcement and concreting of the shell, hydraulic installation (skimmers or overflow), waterproofing, interior finish and surround works. Each phase has its own timeline and cannot be overlapped without losing quality.

A pool is a structural masonry work with specific installations: reinforced concrete shell, waterproofing, filtration equipment, submerged lighting and, in detached properties, a landscaped surround that forms an inseparable part of the project.

Pool construction areas

The areas that structure a pool build

A built-in pool is not just the shell: it is a set of connected areas that have to be designed together. These are the five fronts a complete project resolves in parallel.

pool Main shell

Water volume with defined geometry, pipe sleeves for the hydraulic installation, built-in steps or entry beach and, if overflow design, perimeter channel.

water_drop Plant room

Technical room with pump, sand or glass filter, treatment equipment (salt chlorination or others) and pool-specific electrical panel.

deck Perimeter deck

Anti-slip pavement around the shell with drainage falls towards perimeter sumps and linear channels.

grass Garden and surround

Green areas, access paths, irrigation and outdoor shower. Defines how the pool is lived beyond the water itself.

lightbulb Outdoor lighting

IP68 submerged luminaires and perimeter deck and garden lighting, on a dedicated circuit with differential protection.

shield Perimeter safety

Regulatory fencing where required, automatic or manual cover and depth signage at the edge of the shell.

Workflow

Phases of a built-in pool: from setting out to commissioning

A residential pool is built in five phases with clear dependencies between them. This is the typical technical path, from setting out on the plot to the first water filling.

  1. straighten
    01

    Setting out and licence

    Check of setbacks to boundaries, plant-room location, machinery access and filing of the major works municipal licence with the signed project.

  2. foundation
    02

    Earthworks and shell

    Controlled mechanical excavation, spoil removal to authorised landfill, blinding concrete, reinforcement of the shell and reinforced concreting with the required pipe sleeves.

  3. water_drop
    03

    Hydraulic installation

    Fitting of skimmers or perimeter overflow, inlet jets, bottom drain, pressure PVC network and connection to the plant room with pump, filter and treatment system.

  4. waterproof
    04

    Waterproofing and finish

    Application of elastic waterproofing membrane over the shell, setting out of the tile layout and bonding of mosaic or pool-grade porcelain with C2-class adhesive and specific grout.

  5. deck
    05

    Surround and commissioning

    Anti-slip pool deck, perimeter coping, outdoor lighting, pool filling and commissioning of the filtration system with pH and sanitiser balance.

Shell and hydraulics

The shell holds the water; the hydraulics keep it clean

Reinforced concrete structure, elastic waterproofing and a correctly sized filtration room decide the next twenty years of the pool, long before the final tiling is seen.

Critical points

Four factors that shape the project before setting out

Before drawing the shell we check four plot constraints. Any of them can shift the pool, change its geometry or even make the works unviable.

straighten

Setbacks to boundaries

Each municipality sets minimum distances from the shell to the plot boundaries and to the house; the first datum to verify in planning.

local_shipping

Machinery access

Excavator, dump truck for spoil removal and concrete mixer: a plot without direct access forces smaller equipment and longer timelines.

landscape

Ground type

Water table, rock or expansive clays condition the excavation method and sometimes the shell reinforcement.

bolt

Available supplies

The plant room needs a correctly sized electrical connection and a water connection with shut-off valve; drainage requires an authorised discharge point.

In service

What the owner sees for the next twenty years

The surround, the lighting and the skimmer line are the part the household lives with every summer. The hidden shell is what keeps that image possible.

Interior finishes

Interior finish: three families and when to choose each

The interior finish is the visible face of the pool and takes the chemical load of the water treatment. The three usual families have very different behaviour, look and cost.

grid_view

Glass mosaic

Best fit

Small vitreous tiles on mesh, with pool-specific grout. The classic Mediterranean option with a wide colour range and the one that best absorbs curved shell geometry.

Worth knowing

Slow, specialised labour. The joint is the weak point: poor grouting lets humidity into the substrate and loosens tiles over the years.

waves

Pool-grade porcelain

Best fit

Rectified porcelain tile certified for continuous immersion, with minimal joint. Allows large formats and finishes mimicking natural stone or cement.

Worth knowing

Requires impeccable shell flatness and flexible C2 adhesive with epoxy grout in critical zones. Steps in the substrate show on the tile.

invert_colors

On-site welded reinforced liner

Best fit

Reinforced PVC sheet welded on site over the shell, with perimeter fixings. Fast installation with good behaviour under small shell movements.

Worth knowing

Typical service life of 10–15 years before the sheet is renewed. Does not allow custom mosaics or trims; the range is the manufacturer's.

Worth knowing

Before deciding the scope

Before commissioning the works, a few technical and administrative decisions must be closed.

gavel
Works licence

Always a major works category: requires technical project, municipal licence and, at completion, a final works certificate signed by the qualified technician.

straighten
Setbacks to boundaries

Each municipality sets minimum distances from the pool to the plot boundaries. It is the first datum to verify in local planning.

front_loader
Machinery access

Excavation needs machine access. In plots without direct access, ramps or phased excavation must be planned, with higher cost.

hourglass_empty
Execution time

A standard residential pool takes 8 to 14 weeks of site work, not counting the previous project and licence phase.

In depth

Built-in pool construction in Málaga and the Costa del Sol

A built-in pool is technically a civil work with its own hydraulic and electrical installations, built on private land. In every municipality in the province it is always classified as major works: it requires a signed technical project, an express municipal licence and, at completion, a final works certificate. The result has little in common with a prefabricated pool: the shell is reinforced concrete with integrated pipe sleeves, the interior finish is chosen between mosaic, porcelain or reinforced liner, and the filtration is sized to the real volume of the shell and the intended use.

Before designing, we verify four plot constraints that decide whether the project is viable as planned or requires changes: the mandatory setbacks to boundaries set by municipal planning, machinery access for mechanical excavation, the type of ground (water table, rock, expansive clays) and the available supplies. On plots without direct access we work with smaller equipment and longer timelines; where the water table is high we reinforce the shell to resist hydrostatic uplift with the pool empty.

Execution runs through five phases with clear dependencies: setting out and licence, earthworks and shell, hydraulic installation, waterproofing and finish, and surround with commissioning. A standard residential pool typically runs 8 to 14 weeks of site work, not counting the previous project and licence phase. The plant room is sized to the shell volume: circulation pump, sand or glass filter and treatment system (salt chlorination is the most requested option on the Costa del Sol).

Frequently asked

Common questions about pool construction

01

Do I need a licence to build a pool?

expand_more

Yes, always. The pool is a major works category in every municipality in the province: it requires a signed technical project, a municipal licence and, at the end, a final works certificate from the qualified technician.

02

How long does it take to build a concrete pool?

expand_more

A standard residential pool takes 8 to 14 weeks to build depending on size, chosen interior finish and surround works. On top of that is the previous project and licence stage.